Neue Infos zur Ariane 6 timeline
Welche?
Die in dem angehängten Bild in Calas Post
OCR liefert:
ARIANE 6 - PROGRAM STATUS
Program on-track for 1st launch July 16st, 2020
Key milestones:
1. Vulcain 2.1 firing test from October 2017
2. Vinci qualification campaign end of November 2017
3. MG6.2 in November-December 2017: authorize start of serial production
4. P12OC 1st firing test in April 2018
5. MG7 in June 2018: end of critical design
6. Technical Qualification in September 2019 and start of combined tests in November 2019
Viele Grüße
Mario (der jetzt auch ein OCR Programm für Windows 10 besitzt
)