Flugtag 5: (zeiten wieder5 in MESZ)
06/04/08 Wed 12:32 03 13 30 Crew wakeup
06/04/08 Wed 14:32 03 15 30 ISS daily planning conference
06/04/08 Wed 15:17 03 16 15 Vestibule outfitting
06/04/08 Wed 15:42 03 16 40 Equipment lock preps
06/04/08 Wed 15:47 03 16 45 OBSS sensor checkout
06/04/08 Wed 16:27 03 17 25 EVA tools prepped
06/04/08 Wed 17:17 03 18 15 Airlock check valve installation
06/04/08 Wed 18:17 03 19 15 Middeck transfers
06/04/08 Wed 18:32 03 19 30 Node 2 aft IMV installation
06/04/08 Wed 18:32 03 19 30 Jumper channel B initial activation
06/04/08 Wed 19:02 03 20 00 Crew meals begin
06/04/08 Wed 20:02 03 21 00 Vestibule outfitting continues
06/04/08 Wed 20:47 03 21 45 Middeck transfers resume
06/04/08 Wed 22:47 03 23 45 JPM hatch opening
06/04/08 Wed 22:52 03 23 50 JPM ingress
06/04/08 Wed 23:27 04 00 25 JPM PCS installation
06/04/08 Wed 23:47 04 00 45 FSE ACM removal
06/04/08 Wed 00:17 04 01 15 JPM setup
06/04/08 Wed 00:27 04 01 25 EVA-2: Procedures review
06/04/08 Wed 01:17 04 02 15 JPM RMS rack transfer
06/04/08 Wed 02:57 04 03 55 EVA-2: Mask pre-breathe and tool config
06/04/08 Wed 03:42 04 04 40 EVA-2: Airlock depress to 10.2 psi
06/04/08 Wed 04:02 04 05 00 ISS crew sleep begins
06/04/08 Wed 04:32 04 05 30 STS crew sleep begins
gruß,
moritz