05.10.:
Inhalt:von NASASpaceflight (unterhalb des Videos bei Youtube)
0:00 - Sunrise at the Launch Site 0:41 - Orbital Launch Site 0:58 - Orbital Launch Mount and Tower 2:05 - Orbital Launch Mount Construction 2:22 - Crews Paint the OLM 2:30 - Launch Tower Construction 3:39 - Quick Disconnect Arm 4:01 - Orbital Tank Farm Construction 5:03 - Tank Lowered Into Place at the Orbital Tank Farm 5:29 - Crews Work on Booster 4 6:26 - The Chopsticks and Carriage 7:32 - Ship 20 and Booster 3's LOX Tank Section 7:49 - Crane Parts Depart Launch Site 7:59 - Crame Disassembly 8:11 - New Red Structure Assembled 9:16 - Liquid Nitrogen Delivery to Suborbital Tank Farm 9:42 - Ship 20 Nose and Forward Flaps 10:06 - Booster Thrust Puck with 9 Engine Mounts 10:18 - Stairs Under Construction Near the Propellant Plant 10:50 - Concrete Poured Near the Propellant Plant 11:23 - Concrete Pumped into Place for the Wide Bay's Foundation
| 12:21 - Barrel Section Disconnected from Crane 12:38 - Barrel Sections Waiting to be Stacked 13:23 - Booster 5 Forward Section #4 (left) 13:57 - Booster 6 Forward Section #2 14:19 - Nosecone Production Underway in Tent 3 14:32 - Ship Common and Forward Domes 14:56 - Booster 5 Grid Fins 15:35 - High Bay Windows Lifted 16:27 - Booster 6 Aft Section #5 16:52 - Hybrid Booster-Ship Tank Under Construction in the Mid Bay 17:34 - Booster 5 Under Construction in the High Bay 18:04 - Booster Forward Section in Production Tent 18:23 - Heat Exchanger Placed Next to Ground Fabrication Building 18:41 - Booster Thrust Simulator 19:14 - TPS Tiles Installed on Nosecone in Tent 3 19:32 - Barrel Section with TPS Tile Mounting Points 19:50 - Steel Cladding Added to Container Wall 20:19 - Powerlines Temporarily Removed So the New Tank Can Pass 20:36 - Large Methane (LCH4) Tank Delivered to Starbase 23:02 - Booster Thrust Puck with 13 Engine Mounts Delivered
|
Eine Verlinkung mit den Zeitmarken geht leider nicht, da die Forumssoftware zu jedem Youtube-Link ein Vorschaubild generiert...