Schöner Artikel zum ISS-Status zum 01.Nov. mit Erklärungen was gerade vorbereitet bzw. durchgeführt wird:
http://gearsofbiz.com/nasa-space-station-on-orbit-status-1-november-2017-preparing-for-the-orbital-atk-cargo-mission/173474Immer wieder beeidruckend ist der durchgeplante Alltag für die Jungs und Mädels dort oben. Hier die "To do"-Liste für den 01. November:
Lighting Effects Sleep Log Entry – Subject
ENERGY Diet Log of Breakfast
Relocate Stowage in N2 to Allow Access to N2 Inter-module Ventilation
ExPRESS Rack 8 Rack Rotate Down Preperation
URAGAN. Observation and photography using Photo Equipment
24-hour ECG Recording (start)
Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Drain
Water Resource Management (WRM) Condensate Sample Init
TIMER. Initiation
PEHG Hardware Install
24-hour Blood Pressure Recording (start)
MELFI 3 Ice Brick Insert 1
VIZIR. Experiment Ops.
Node 2 Forward Intermodule Ventilation (IMV) Reconfiguration
VHF-2 test from Soyuz 736 via US ground sites
СОЖ maintenance
Regenerative Environmental Control and Life Support System (RGN) Wastewater Storage Tank Assembly (WSTA) Fill
TIMER. Experiment Ops Video Termination and Cleanup
TV conference with VOSKHOD theme-based children’s camp.
Regul-OS antenna feeder system test using FSH3
Photo/TV SAW Mast Port Survey
Water Resource Management (WRM) Condensate Sample Terminate
ENERGY Diet Log of Lunch
BCR/RFID Scanner Reset
Cygnus PROX C/O Review
ExPRESS Rack 8 Rack Rotate Up
Cygnus PROX Switch ON
Video Recording of Greetings
Earth Imagery from ISS Crew Preference Target Operations
Public Affairs Office (PAO) Event in High Definition (HD) – Lab
Procedure review for the LAB1O5 ZSR and LAB1D4 CHeCS Rack Swap
Life On The Station Photo and Video
Preventive Maintenance of SM Ventilation Subsystem. Group В2 (SKV1)
Polar Hardware Install into Express Rack
Miniature Exercise Device Hardware Gather
Bone Densitometer Rack Installation
At Home In Space Culture Photo
Solar Array Survey Equipment Stow
CONTENT. Experiment Ops
Node 2 Camcorder deactivation
PMM Rack Front Cleanup
VIZIR. Experiment Ops
Node 2 Forward Stowage Replace
USOS Window Shutter Close
Корабль Cygnus – тест пульта выдачи команд с лэптопа PCS в режимах BSP-B и TRX-B
Environmental Health System (EHS) – Formaldehyde Monitoring Kit (FMK) Deployment Operations
Environmental Health System (EHS) Grab Sample Container (GSC) Sampling Operations
EarthKAM Node 2 Lens Change
Monitoring shutter closure on windows 6, 8, 9, 12, 13, 14
TIMER. Battery Charge
ENERGY Diet Log of Dinner