Raumcon

Raumfahrt => Unbemannte Raumfahrt => Thema gestartet von: paygar am 23. Februar 2006, 22:12:19

Titel: Start von SpaceTech5 mit Pegasus XL verschoben
Beitrag von: paygar am 23. Februar 2006, 22:12:19
Es gibt mal wieder eine Startverschiebung:

STATUS REPORT: E06-007

NASA Expendable Launch Vehicle Status Report: E06-007
Mission: Space Technology 5 (ST5)
Launch Site: Vandenberg Air Force Base, Calif.
Launch Vehicle: Orbital Sciences Pegasus XL
Launch Date: No earlier than March 6, 2006
Launch Window: 8:57:31 a.m. to 10:19:50 a.m. EST
Targeted Drop Time: 9:02 a.m. EST

The ST5 launch has been rescheduled to no earlier than March 6. The delay allows time for review of data from the spacecraft's separation system to ensure it will function when intended during the flight.
The Pegasus/ST5 combination was mated to the transporter on Monday as planned.
Transportation to the runway for mating to the L-1011 carrier aircraft is scheduled for March 2.
An integrated launch vehicle/spacecraft combined systems test and an ST5 state-of-health check is scheduled for March 3.


Die drei Satelliten werden also nicht vor dem 6. März starten. Kann denn keine Rakete pünktlich starten?

(https://images.raumfahrer.net/up024882.gif)

(https://images.raumfahrer.net/up024883.jpg)
Satelliten bei den Startvorbereitungen

paygar
Titel: Re: Start von SpaceTech5 mit Pegasus XL verschoben
Beitrag von: Martin am 23. Februar 2006, 22:18:28
Klingt als wäre die Deutsche Bahn AG in die Raumfahrt eingestiegen.
Titel: Re: Start von SpaceTech5 mit Pegasus XL verschoben
Beitrag von: Bricktop am 24. Februar 2006, 01:28:49
Zitat
Klingt als wäre die Deutsche Bahn AG in die Raumfahrt eingestiegen.
Hoffentlich nicht, sonst wird die Raumfahrt noch teuerer...